PRACTICAL TOOLKIT · SUMMER READY

A 25-point check before Perth's peak season

Last reviewed: 17 November 2026

Perth's busiest short-stay months run from December to February, on hot days, full pools and a live bushfire season. This one-page audit sorts the legal requirements from good practice, with the WA source for each.

7 min read

What to check
25 items across safety, guest comfort, your listing and your neighbours, before the summer rush.
Who it affects
Every WA host, owner, co-host and property manager running a residential short stay.
What to do
Work the list once now, fix anything marked Law first, and keep the sheet with your property file.

As the summer holidays approach, short-stay operators face tighter turnarounds and less room for a forgotten detail. A dead smoke alarm battery, a pool gate that no longer self-latches, or a listing missing its registration number are the kind of small gaps that are cheap to fix in November and expensive to discover in January.

This audit is built to be printed on one page and worked through room by room. It separates two very different things. Some items are the law in Western Australia, and the obligation is usually triggered the moment a dwelling is rented or made available for hire, which is the category that captures short-stay letting. Others are good practice: not legally required of a short stay as such, but the difference between a smooth season and a bad review or a worse incident.

Where an item is marked Law, we name the WA regulator and the page it comes from, all read on 17 November 2026. Where the law is genuinely unclear for short stays, we say so and treat the item as good practice. None of this replaces advice from the regulator or your local government, and the detailed technical rules (exact fence heights, alarm placement, ventilation openings) sit in the regulators' own guides. Start with the items marked Law, then work the rest.

One habit worth keeping: date and sign the sheet each time. A dated check records what you inspected and what work is still outstanding.

The 25-point audit

Legend: Law = a legal requirement in Western Australia (triggered on rent or hire). Law where applicable = required for some properties only, as explained. Good practice = recommended, not a short-stay-specific legal requirement. Source codes are listed under the table.

#CheckWhy it matters (status · source)Done
SAFETY
1Compliant smoke alarms installed and working (AS 3786, mains-powered, in the required locations) before any guest staysRequired before rent or hire. A battery alarm with a 10-year non-removable battery is allowed only in limited cases. Law · B&E-Smoke☐
2No alarm older than 10 years or past its expiry dateAlarms must be "not more than 10 years old". Law · B&E-Smoke☐
3Smoke alarms interconnected where requiredRequired where more than one alarm is installed, except dwellings built on a building-permit application made before 1 May 2015. Law where applicable · B&E-Smoke☐
4Required RCD (safety switch) protection: at least two RCDs on the power and lighting circuitsMust be in place before guests stay; have a licensed electrician confirm. Law · B&E-RCD☐
5Electrical and gas work done by appropriately licensed people where legally requiredDo not undertake regulated installation, repair or modification work without the right licence. Law · B&E-RCD / B&E-Gas☐
6Pool or spa safety barrier compliant (water deeper than 30cm): gate self-closing and self-latchingThe owner must keep the barrier compliant at all times; councils generally inspect at intervals of no more than four years. Law · B&E-Pool☐
7Pool barrier climb zones clear (no furniture, pots, plants or ledges a child could climb)Objects near the barrier can breach its required non-climbable zones. Law where applicable · B&E-Pool☐
8Blind and curtain cords secured out of children's reachKeep looped cords and chains out of reach with safety devices; keep furniture away. Good practice · CP-Cords☐
9Gas heaters serviced (at least every 2 years; annually if over 10 years)Regulator advises servicing by a licensed gas fitter. Good practice · B&E-Gas☐
10Carbon monoxide alarm fitted near gas appliancesRegulator recommends one as a back-up. Good practice · B&E-Gas☐
11First aid kit stocked; emergency numbers (000) displayed for guestsNo short-stay-specific rule found; sensible for any let home. Good practice☐
12Bushfire plan ready if in a bushfire-prone area: cleared asset-protection zone, guest evacuation infoOwners are responsible for preparing; sheltering is a last resort. Good practice · DFES☐
GUEST-READY
13Air conditioning tested and serviced as needed before summerTest cooling now and book a service if needed. Good practice☐
14Ceiling and portable fans working in every bedroomBackup cooling on the hottest nights. Good practice☐
15Blackout blinds or curtains working in bedroomsEarly sunrise and long evenings hurt sleep scores. Good practice☐
16At least three sets of linen and towels per bed on handFast turnarounds need spares (industry rule of thumb). Good practice☐
17Wi-Fi tested, password shown, speed adequate for streamingA near-universal guest expectation. Good practice☐
18Fridge and freezer clean and cold; ice availableBasic comfort and a food-safety point in the heat. Good practice☐
LISTING
19STRA registration number shown conspicuously in every advertisementRequired since 1 January 2025 to advertise or take bookings. Law · STRA☐
20House rules current: noise, parties, maximum guests, pets, smokingSets expectations and supports any later dispute. Good practice☐
21Summer check-in instructions updated (lockbox code, parking, how to run the A/C)Cuts arrival-night messages at the busiest time. Good practice☐
22Emergency and local-contact details in the guest guideGuests need to reach someone fast if something fails. Good practice☐
NEIGHBOURS AND STRATA
23Quiet-hours and noise expectations set and visibleClear expectations prevent the most avoidable neighbour complaints. Good practice☐
24Parking bays allocated and explained; bin and rubbish days noted for guestsProtects the street and the relationship. Good practice☐
25Strata by-laws checked for short-stay conditions; a local contact who can respond quicklyStrata rules can restrict or condition short stays. Good practice☐

Source codes (all pages read 17 November 2026):

  • B&E-Smoke — Building and Energy, smoke alarm laws (last updated 26 November 2024): wa.gov.au/organisation/building-and-energy/smoke-alarm-laws-homes-being-sold-rented-and-hired
  • B&E-RCD — Building and Energy, RCD safety switches (last updated 2 July 2026): wa.gov.au/government/multi-step-guides/electrical-safety-home/rcd-safety-switches
  • B&E-Pool — Building and Energy, pool and spa barrier requirements (last updated 2 October 2026): wa.gov.au/organisation/building-and-energy/swimming-pool-and-spa-safety-barrier-requirements
  • B&E-Gas — Building and Energy, gas safety at home (last updated 30 May 2025): wa.gov.au/organisation/building-and-energy/gas-safety-home
  • CP-Cords — Consumer Protection, blind and curtain cord safety (last updated 21 November 2024): consumerprotection.wa.gov.au/consumer-protection/blind-and-curtain-cord-safety
  • DFES — DFES, prepare for a bushfire: dfes.wa.gov.au/hazard-information/bushfire/prepare
  • STRA — STRA advertising requirements (last updated 9 July 2025) and STRA Register FAQ (last updated 9 January 2025): wa.gov.au, search "STRA advertising requirements".
Key point: A dated pre-season checklist records what was inspected, shows what work is outstanding and helps you book professional checks where required.

What this means for WA hosts

Bottom line: Clear the legal items first, then work the comfort and neighbour items before December.

Who it applies to: Every WA host, owner, co-host and property manager running a residential short stay.

Do this:

  1. Book a licensed electrician and gas fitter for any safety-switch, wiring or gas work.
  2. Confirm your pool or spa barrier is compliant and its council inspection is current.
  3. Put your STRA registration number on every listing and advertisement.
  4. Test alarms, A/C and Wi-Fi, and restock linen to three sets per bed.
  5. Date and sign the sheet, and keep it with your property file.

Deadline / cost: Complete before peak season (December to February). Costs vary by trade; the audit itself is free.

Official link: wa.gov.au (Building and Energy) and dfes.wa.gov.au. Check pool rules with your local government.

General information only, current to 17 November 2026. Not legal advice. Confirm your obligations with the regulator and your local council.

Sources: wa.gov.au; consumerprotection.wa.gov.au; dfes.wa.gov.au
Checked 17 November 2026.

General information only, current to 17 November 2026. Not legal, tax or financial advice.

Back to Issue 1 · December 2026 contents